MMEPL Developing Tughlakabad Depot Layout

MMEPL Successfully completed a Project on Fixing suitable Alignment from the proposed underground Tughlakabad station to proposed Ali Gaon Station (Elevated /Semi underground/at grade etc.) and developing optimum Tughlakabad Depot Layout Plan on IGI-TKD Corridor of Phase-IV of Delhi MRTS Project.

The Salient Features of this project are as under : 

  • Preparing various options for Depots Layout.
  • Proposing various options to DMRC for at grade depot for maximum utilization of Land.
  • Developing Layouts as per the DMRC metro guidelines on radius, turnouts, cross over and gradient, further showing provision of maximum stabling lines for the current and future provisions.
  • Preparing Shaft Layout arrangement for TBM retrieval and ramp arrangement for the depot.
  • Suggesting the formation level of depot and related structures with respect to vicinity.
  • Preparing Tender Drawings for Depots covering the Structural arrangement for various buildings.
  • Developing Layouts matching with the Corridor alignment.